Since 2007 JSC “OGK-1” has produced     mil kW/h.  
Search: Search
Electricity Production

OGK-1 Group Electricity Production Download Data in xls

Verkhnetagilskaya GRES
Iriklinskaya GRES
Kashirskaya GRES
Nizhnevartovskaya GRES
Permskaya GRES
Urengoyskaya GRES

The electricity production data is given in accordance with the OGK-1 Group production results. It comprises Permskaya GRES, Verkhnetagilskaya GRES, Kashirskaya GRES, Nizhnevartovskaya GRES, Urengoyskaya GRES, Iriklinskaya GRES. Two exiting power units of Nizhnevartovskaya GRES have been transferred to the authorized capital of ZAO Nizhnevartovskaya GRES. 100% shares of ZAO «Nizhnevartovskaya GRES» belong to NVGRES HOLDING LIMITED (NHL). 75% - 1 share of the NHL authorized capital belong to JSC «OGK-1», 25%+1 share belong to TNK-BP. On August 1, 2008 ZAO Nizhnevartovskaya GRES became an independent legal entity of the wholesale energy market

2006 2007 2008 2009

Electricity Production - OGK-1, 2009, mln kWh
January-June 15262,92
Total 15262,92

Electricity Production - OGK-1 Group, 2009, including Nizhnevartovskaya GRES Results, mln kWh

January-June 21369,99
Total 21369,99
   

Thermal Power Plant

TPP Share in the Electricity Production - OGK-1 Group, 2009

Verkhnetagilskaya GRES 14,0%
Iriklinskaya GRES 16,7%
Kashirskaya GRES 12,6%
Nizhnevartovskaya GRES 28,6%
Permskaya GRES 27,7%
Urengoyskaya GRES 0,4%
Total 100%

TPP Share in the Electricity Production - OGK-1 Group, 2009

Electricity Productive Supply - OGK-1, 2009, mln kWh
January-June 14399,35
Total 14399,35

Note: The data is given without the results of ZAO Nizhnevartovskaya GRES, except for the “TPP Share in the Electricity Production - OGK-1 Group, 2009”

Verkhnetagilskaya GRES is located in Yekaterinburg region, in 80 km to the north from Yekaterinburg

The Power Plant has an installed capacity of 1, 497 MW and is one of the main electricity suppliers in Yekaterinburg region.

Heat capacity of Verkhnetagilskaya GRES amounts to 0.5 thousand GCal/hour.

2006 2007 2008 2009

Electricity Production - Verkhnetagilskaya GRES, 2009, mln kWh
January-June 2987,03
Total 2987,03

Electricity Productive Supply - Verkhnetagilskaya GRES, 2009, mln kWh
January-June 2733,20
Total 2733,20

Iriklinskaya GRES is one of the biggest power plants in the Southern Urals.

Irirklinskaya GRES is located in the eastern part of the Orenburg region in the centre of a highly developed economic region. Magnitogorsk is to the north from Orenburg, Orsk-Aktyubinsk industrial area – is to the south, a rich in resources Sokolovsk-Orbaysk iron field – to the east, Mednogorsk and Kuvandyk – to the west. The nearest big city of Orsk is in 100 km. Iriklinskaya GRES is a major company of the village of Energetik. The population of Energetik amounts to 9.5 thousand people.

Iriklinskaya GRES has its own hydro power station with the capacity of 30 MW. The Hydro power plant is located in 20 km from Iriklinskaya GRES.

Iriklinskaya power plant installed capacity amounts to 2, 430 MW (altogethter with the hydro power plant with the installed capacity of 30 MW).

Iriklinskaya GRES power plant heat capacity amounts to 0.2 thousand GCal/hou

2006 2007 2008 2009

Electricity Production - Iriklinskaya GRES, 2009, mln kWh
January-June 3571,91
Total 3571,91

Electricity Productive Supply - Iriklinskaya GRES, 2009, mln kWh
January-June 3380,04
Total 3380,04

Kashirskaya GRES is located in the city of Kashira-2 of the Moscow region, in 115 km from Moscow, on the bank of the Oka river. Kashira-2 is a city, built for the first employees which turned into a big city of the region. Kashirskaya GRES is the biggest company of the Kashira region.

Kashirskaya GRES installed capacity amounts to 1, 580 MW (6 power units: double units 300 MW each ¹ 1-2, monounits 300 MW ¹ 4-6, Heat power unit 80 MW ¹ 7).

Kashirskaya GRES heat capacity amounts to 0.4 thousand GCal/hour.

2006 2007 2008 2009

Electricity Production - Kashirskaya GRES, 2009, mln kWh
January-June 2695,97
Total 2695,97

Electricity Productive Supply - Kashirskaya GRES, 2009, mln kWh
January-June 2495,19
Total 2495,19

ZAO Nizhnevartovskaya GRES is located in 15 km from Nizhnevartovsk on the bank of the Vakh river. In 1.5 km from the power plant there is a village of power plant employees – Izluchinsk. Its population amounts to 16.5 thousand people. Nizhnevartovskaya GRES installed capacity is 1,600 MW (2 power units 800 MW each).

On August 1, 2008 ZAO Nizhnevartovskaya GRES became an independent legal entity of the wholesale energy market.

Nizhnevartovskaya GRES heat capacity amounts to 0.8 thousand GCal/hour.

2006 2007 2008 2009

Electricity Production - Nizhnevartovskaya GRES, 2009, mln kWh
January-June 6107,06
Total 6107,06

Electricity Productive Supply - Nizhnevartovskaya GRES, 2009, mln kWh
January-June 5947,21
Total 5947,21

Permskaya GRES is located in 70 km from Perm and in 5 km to the north-west from the city of Dobryanka, on the left bank of the Kama water reservoir between the industrial center of the Perm region (oil mining and oil refining, petrochemistry, machine construction and other energy consuming production) and the Verkhnya Kama industrial center (petrochemistry, chemistry, non-ferrous and ferrous metallurgy, lumbering and natural resources mining).

The installed capacity of the first line of power units of the GRES amounts to 2, 400 MW. Nowadays 3 steam power units with the installed capacity of 800 MW each are under exploitation at the power plant. They were constructed in the period between 1986 and 1990.

Permskaya GRES heat capacity amounts to 0.62 thousand GCal/hour.

2006 2007 2008 2009

Electricity Production - Permskaya GRES, 2009, mln kWh
January-June 5920,46
Total 5920,46

Electricity Productive Supply - Permskaya GRES, 2009, mln kWh
January-June 5713,65
Total 5713,65

Urengoyskaya GRES (UGRES) is located on the bank of the lake Yamylimuyaganto in the river basin of the river Pur in 70 km to the south from the Polar circle, on the territory of the Limbyayakha region, which is a part of Noviy Urengoy. Noviy Urengoy is located in Yamalo-Nenetskiy Administrative District of the Tyumen region.

Urengoyskaya GRES installed capacity amounts to 24 MW.

Urengoyskaya GRES heat capacity amounts to 0.4 thousand GCal/hour.

2006 2007 2008 2009

Electricity Production - Urengoyskaya GRES, 2009, mln kWh
January-June 87,54
Total 87,54

Electricity Productive Supply - Urengoyskaya GRES, 2009, mln kWh
January-June 77,27
Total 77,27



                           

  
Legal notice | Print page | Send this page to a friend | Feedback form | Contacts
JSC "First Power-Generating Company on the Wholesale Energy Market"
13/17, Bolshaya Cheremushkinskaya S., Moscow, 117447, Russia Fax: +7 (495) 225-40-90