Since 2007 JSC “OGK-1” has produced     mil kW/h.  
Search: Search
Heat Production

OGK-1 Group Productive Heat Supply Download Data in xls

Verkhnetagilskaya GRES
Iriklinskaya GRES
Kashirskaya GRES
Nizhnevartovskaya GRES
Permskaya GRES
Urengoyskaya GRES

Heat is mostly supplied to the residential housing of the nearby cities and villages which are located next to the power plants. The amount of heat supplied depends directly on climate.

Heat production data is given for the OGK-1 group of companies. The group of companies comprise Permskaya GRES, Verkhnetagilskaya GRES, Kashirskaya GRES, Nizhnevartovskaya GRES, Urengoyskaya GRES, Iriklinskaya GRES. Two exiting power units of Nizhnevartovskaya GRES have been transferred to the authorized capital of ZAO Nizhnevartovskaya GRES. 100% shares of ZAO «Nizhnevartovskaya GRES» belong to NVGRES HOLDING LIMITED (NHL). 75% - 1 share of the NHL authorized capital belong to JSC «OGK-1», 25%+1 share belong to TNK-BP. On August 1, 2008 ZAO Nizhnevartovskaya GRES became an independent legal entity of the wholesale energy market.

2006 2007 2008 2009

Productive Heat Supply - OGK-1, 2009, thousand Gcal
January 127,79
Total 127,79

TPP Share in the Productive Heat Supply Structure - OGK-1 Group, 2009

Note: The data is given without the results of ZAO Nizhnevartovskaya GRES, except for the “TPP Share in the Productive Heat Supply Structure - OGK-1 Group, 2009”.

Verkhnetagilskaya GRES is located in Yekaterinburg region, in 80 km to the north from Yekaterinburg

The Power Plant has an installed capacity of 1, 497 MW and is one of the main electricity suppliers in Yekaterinburg region.

Heat capacity of Verkhnetagilskaya GRES amounts to 0.5 thousand GCal/hour.

2006 2007 2008 2009

Productive Heat Supply - Verkhnetagilskaya GRES, 2009, thousand Gcal
January 19,97
Total 19,97

Iriklinskaya GRES is one of the biggest power plants in the Southern Urals.

Irirklinskaya GRES is located in the eastern part of the Orenburg region in the centre of a highly developed economic region. Magnitogorsk is to the north from Orenburg, Orsk-Aktyubinsk industrial area – is to the south, a rich in resources Sokolovsk-Orbaysk iron field – to the east, Mednogorsk and Kuvandyk – to the west. The nearest big city of Orsk is in 100 km. Iriklinskaya GRES is a major company of the village of Energetik. The population of Energetik amounts to 9.5 thousand people.

Iriklinskaya GRES has its own hydro power station with the capacity of 30 MW. The Hydro power plant is located in 20 km from Iriklinskaya GRES.

Iriklinskaya power plant installed capacity amounts to 2, 430 MW (altogethter with the hydro power plant with the installed capacity of 30 MW).

Iriklinskaya GRES power plant heat capacity amounts to 0.2 thousand GCal/hour

2006 2007 2008 2009

Productive Heat Supply - Iriklinskaya GRES, 2009, thousand Gcal
January 16,80
Total 16,80

Kashirskaya GRES is located in the city of Kashira-2 of the Moscow region, in 115 km from Moscow, on the bank of the Oka river. Kashira-2 is a city, built for the first employees which turned into a big city of the region. Kashirskaya GRES is the biggest company of the Kashira region.

Kashirskaya GRES installed capacity amounts to 1, 580 MW (6 power units: double units 300 MW each ¹ 1-2, monounits 300 MW ¹ 4-6, Heat power unit 80 MW ¹ 7).

Kashirskaya GRES heat capacity amounts to 0.4 thousand GCal/hour.

2006 2007 2008 2009

Productive Heat Supply - Kashirskaya GRES, 2009, thousand Gcal
January 40,94
Total 40,94

ZAO Nizhnevartovskaya GRES is located in 15 km from Nizhnevartovsk on the bank of the Vakh river. In 1.5 km from the power plant there is a village of power plant employees – Izluchinsk. Its population amounts to 16.5 thousand people. Nizhnevartovskaya GRES installed capacity is 1,600 MW (2 power units 800 MW each).

On August 1, 2008 ZAO Nizhnevartovskaya GRES became an independent legal entity of the wholesale energy market.

Nizhnevartovskaya GRES heat capacity amounts to 0.8 thousand GCal/hour.

2006 2007 2008 2009

Productive Heat Supply - Nizhnevartovskaya GRES, 2009, thousand Gcal
January 24,25
Total 24,25

Permskaya GRES is located in 70 km from Perm and in 5 km to the north-west from the city of Dobryanka, on the left bank of the Kama water reservoir between the industrial center of the Perm region (oil mining and oil refining, petrochemistry, machine construction and other energy consuming production) and the Verkhnya Kama industrial center (petrochemistry, chemistry, non-ferrous and ferrous metallurgy, lumbering and natural resources mining).

The installed capacity of the first line of power units of the GRES amounts to 2, 400 MW. Nowadays 3 steam power units with the installed capacity of 800 MW each are under exploitation at the power plant. They were constructed in the period between 1986 and 1990.

Permskaya GRES heat capacity amounts to 0.62 thousand GCal/hour.

2006 2007 2008 2009

Productive Heat Supply - Permskaya GRES, 2009, thousand Gcal
January 42,27
Total 42,27

Urengoyskaya GRES (UGRES) is located on the bank of the lake Yamylimuyaganto in the river basin of the river Pur in 70 km to the south from the Polar circle, on the territory of the Limbyayakha region, which is a part of Noviy Urengoy. Noviy Urengoy is located in Yamalo-Nenetskiy Administrative District of the Tyumen region.

Urengoyskaya GRES installed capacity amounts to 24 MW.

Urengoyskaya GRES heat capacity amounts to 0.4 thousand GCal/hour.

2006 2007 2008 2009

Productive Heat Supply - Urengoyskaya GRES, 2009, thousand Gcal
January 7,81
Total 7,81



                           

  
Legal notice | Print page | Send this page to a friend | Feedback form | Contacts
JSC "First Power-Generating Company on the Wholesale Energy Market"
13/17, Bolshaya Cheremushkinskaya S., Moscow, 117447, Russia Fax: +7 (495) 225-40-90